SEPA review for Fennel Creek Lift Station and sewer extension | Bonney Lake

The City of Bonney Lake received an application for State Environmental Policy Act (SEPA) review for the Fennel Creek Lift Station and sanitary sewer extension project within the City of Bonney Lake.

The City of Bonney Lake received an application for State Environmental Policy Act (SEPA) review for the Fennel Creek Lift Station and sanitary sewer extension project within the City of Bonney Lake.

Project Name: Fennel Creek Lift Station and Sanitary Sewer Extension Project.

File Number: PLN 2016-01878

Description of Proposal: The applicant requests SEPA review for the Fennel Creek Lift Station and Sanitary Sewer Extension Project. The applicant proposes to develop a sanitary sewer lift station on City of Bonney Lake property near the intersection of 192nd Avenue East and Sumner-Buckley Highway East. The applicant will install a sanitary sewer main within the rightof-way along Sumner Buckley Highway East and Veterans Memorial Drive East.

Applicant: City of Bonney Lake, c/o John Woodcock, P.E. – City Engineer, 19306 Bonney Lake Boulevard East, Bonney Lake, WA 98391, Phone: (253) 447-4336,

Email: jw@ci.bonneylake.wa.us.

Location: The project is located within S33, T20N, R5E, W.M., Bonney Lake, WA. The lift station is located on the southwest corner of the intersection of 192nd Avenue East and SumnerBuckley Highway East.

Documents Submitted with Application: SEPA Checklist, Associated Maps and Drawings, and Subsurface and Geotechnical Report.

Environmental Determination: The City of Bonney Lake reviewed the proposal for probable adverse environmental impacts and is likely issuing a determination of nonsignificance (DNS) for this project under the optional DNS process in WAC 197-11-355. This may be your only opportunity to comment on the environmental impacts of the proposed project.

Staff Contact: Ryan Harriman, AICP, Associate Planner, City of Bonney Lake Community Development Department, 9002 Main Street East, Suite 300, Bonney Lake, WA 98391, Phone: (253) 447-4350, Email: harrimanr@ci.bonney-lake.wa.us.

Written comments shall be submitted to the staff contact prior to 5:00PM on March 9, 2016. The environmental threshold determination may be appealed within fifteen (15) from the date of issuance of the DNS.